|
| image = | image_width = | image_alt = | caption = | type = Rapid transit | system = Ningbo Rail Transit | status = Under construction | locale = Ningbo, Zhejiang, China | start = Gaotang Bridge | end = Datong Bridge | stations = 15 | routes = | ridership = | open = 2019 | close = | owner = Ningbo | operator = Ningbo Rail Transit Co.,Ltd. | character = Underground | depot = | stock = | linelength = | tracklength = | notrack = 2 | gauge = | el = | speed = | elevation = | website = | map = | map_state = collapsed }} Line 3 of Ningbo Rail Transit () is a rapid transit line under construction in Ningbo. It starts from south Yinzhou District and ends in Datong Bridge Station in Jiangbei District. In the future extension plan, the line will further extend into Luotuo Area in Zhenhai District.〔(我委批复轨道交通3号线一期工程可行性研究报告 )〕 The construction of first section, from south Yinzhou to Datong Bridge, started in December 23, 2014.〔(宁波地铁3号线一期开工 2019年试营 )〕 == Route == Line 3 starts from Gaotang Bridge Station in south Yinzhou District as an underground line. Then it turns into east-west direction on Yunzhou Avenue and makes a further turn into Ningnan South Road and goes in north-south direction again until it reaches Songjiang Middle Road. Then it runs to northeast to Qiubi and then crosses Yongtaiwen Railway from which it goes in north-south direction and extends along Zhongxing Road until it crosses Yongjiang River and reaches its destination, Datong Bridge Station.〔China Railway Siyuan Survey and Design Group, Environment impact report of Line 3, Ningbo Rail Transit, Wuhan, February, 2014〕 抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Line 3, Ningbo Rail Transit」の詳細全文を読む スポンサード リンク
|